Homeowner guide · by Eric L. Scott, owner

What costs extra on a new roof?

It is one of the top three questions homeowners ask Eric. No surprises: here is the list.

The main unknown is hidden decking after tear-off. Eric says the first three sheets are included, additional sheets are about $89 each up to ten total, and more than ten requires a signed decking agreement. Extra-layer tear-off is included. Optional gutters, siding and related work should be priced separately from the base roof.

Watch: Eric on what he checks under your shingles

Eric on what he checks under your shingles (34 sec). Watch on YouTube

Last updated:

Rotten decking

Rotten decking can only be seen after tear-off. If it shows up, it is replaced at about $89 per sheet, and you are told before it happens.

Add-ons, never hidden

Gutters, soffit, fascia and siding are optional add-ons and are never buried in the base price.

What is in the base quote

Tear-off, decking inspection, underlayment, the roofing system, flashing, ventilation, cleanup and warranty, each line explained.

Warranty is priced in

On new Malarkey installs the 50-year Malarkey warranty and the 10-year workmanship warranty are priced into the quote, not bolted on after.

Book a free roof inspection

More guides: Roof replacement cost guide · Hail damage insurance claim guideFirst 24 hours after hailMalarkey vs. GAF shinglesHow long a roof lasts in Oklahoma · Malarkey Class 4 & your insurance premium · Oklahoma roofing questions, answered · Rubberized asphalt vs. standard asphalt shingles · Repair or replace your roof? · Veterans roofing discount in Oklahoma

Agree on hidden-decking work before it starts

Eric's stated terms include the first three decking sheets, followed by about $89 per sheet up to ten sheets total. More than ten calls for a signed decking agreement. Ask the estimate to show the included allowance, how additional sheets are counted and who authorizes the work.

Extra-layer tear-off is included in Eric's stated pricing. Optional gutters, siding, skylights and other work should appear as separate scope rather than being assumed part of a roof replacement. Ask for documentation of any proposed change before agreeing to the additional cost.

Split the budget into included work, unknowns and choices

A roof price becomes easier to understand when every item falls into one of three groups. Included work belongs in the original scope. Hidden conditions need a stated allowance and approval process. Optional improvements need a separate decision. Those groups should not be mixed into a single line called extras. Ask Eric to walk through them before signing so you know which costs are fixed by the proposal and which require another conversation.

For an Oklahoma homeowner comparing bids, this is more useful than asking only for the cheapest roof. One proposal may explain a decking allowance while another leaves it unstated. One may include an item that another lists separately. Neither difference can be judged from the total alone. Put the scope beside the price, mark the unanswered items and request a clear explanation. That is how you find a real difference instead of guessing from a shorter document.

Why the deck is different from the visible shingles

The decking sits beneath the roofing, so an estimate cannot treat every concealed area as fully visible before tear-off. The inspection and the opening of the roof answer different questions. Ask what has been observed already and what remains concealed. Do not treat an honest statement about hidden conditions as evidence that unlimited extra charges are allowed. The reason to discuss an allowance is to put boundaries around that uncertainty.

Once the old material is removed, ask for an explanation of any decking replacement proposed for your roof. The explanation should distinguish what is being replaced from the rest of the deck. Eric's original answer above says you will be told before it happens. Confirm how that notice and approval will work if you are not physically at the house. The price rule is useful only when the quantity and the reason for the work are clear too.

Work through the sheet allowance in plain numbers

Eric's stated allowance starts with three included sheets. If the total replacement is four sheets, one sheet is beyond that allowance. At about $89 for that additional sheet, the example extra is about $89. This is an illustration of the stated rule, not a finding that your house needs four sheets. Ask the written estimate to confirm the unit price and whether any other terms affect the particular job.

If ten sheets in total are needed, seven are beyond the first three. Seven times $89 is $623 under that same example. More than ten total triggers the signed decking agreement Eric describes. Do not extend the example beyond that point and assume the same authorization applies automatically. The purpose of doing the arithmetic before installation is to understand the counting method, not to preapprove an unknown quantity or create a substitute for the signed scope.

What should a decking change record contain?

Ask it to identify the proposed additional work, the quantity, the price basis and the person authorizing it. Keep the record with the original roof estimate so you can understand the final invoice later. If the proposal changes while you are talking, ask for the revised version before agreeing. A clear record is especially helpful when more than one household member is following the project.

You can also ask for documentation of the condition being addressed. Do not assume a photograph alone explains the full cost or that an unexplained quantity is enough. The useful record connects the condition, proposed work and approved amount. If you are coordinating remotely, agree beforehand on how that information will be sent and how your approval will be recorded. That avoids turning a time-sensitive decision into a vague recollection of a phone call.

Extra layers are not a separate surprise in Eric's stated pricing

Eric says extra-layer tear-off is already included. Ask the proposal to carry that understanding so the signed document matches the conversation. Do not mix extra-layer removal with hidden decking replacement; they are separate topics. Removing existing roof layers is part of reaching the deck, while replacing damaged deck material addresses what is found underneath. A single word such as tear-off should not be used to obscure that distinction.

If another bid charges differently for layers, compare the full scope rather than assuming one contractor is describing the same allowance. Ask each bidder what the price covers and where a possible change begins. This guide explains Eric's stated approach, not a rule every roofing company follows. You should be able to read the estimate and understand the treatment of layers without depending on a verbal promise you cannot find later.

Gutters and exterior work are choices, not automatic roof charges

Replacing a roof does not automatically order new gutters, soffit, fascia or siding. Eric treats those as optional additions rather than burying them in the base roof price. If you want them evaluated, ask for a separate description of the work. If you do not want them included, make sure the proposal is clear about that too. A useful estimate allows you to understand the roof decision on its own.

For gutter work, the stated range is $9.50 to $11.50 per linear foot. Have the proposal identify the actual measured scope rather than estimating your total from the house's floor area. A linear-foot price and a roof price measure different work. If you are discussing siding at the same time, ask for its own scope as well. Bundling the discussion should not blur which work you approved.

Which roof components are already in the base scope?

The original base-quote list includes tear-off, decking inspection, underlayment, the roofing system, flashing, ventilation, cleanup and warranty. Ask what each of those means on your proposal. The list is a starting point for the explanation, not permission to assume that every possible related repair is included. If a chimney or skylight raises a separate issue, have that issue described rather than leaving it under a broad word such as flashing.

Likewise, inspection of the deck is different from unlimited replacement of the deck. The allowance described earlier explains how those two ideas fit together. Read the base scope and the hidden-condition terms as a pair. A strong question is: which work is included in this amount, and which specific finding would require a new decision? That gives Eric a direct way to explain the boundary without promising that concealed conditions never occur.

Warranty should not turn into an unexplained checkout fee

Eric's stated new-Malarkey pricing includes the material and workmanship warranty package described above. Ask the estimate to identify that package and request the written terms. Do not assume that a warranty number answers every eligibility question. The stated non-prorated Malarkey material terms are for a primary residence, not a rental, and the one-time transfer has its own written conditions. Tell Eric the property use before comparing warranty descriptions.

Keep warranty registration separate from optional upgrades. You should know what is already priced into the proposal before deciding whether to buy any additional work. If a revised estimate introduces a line you do not recognize, ask what changed and why. A clear answer may reveal a changed scope or a misunderstanding. Either way, resolve it before treating the revised total as the amount you authorized.

Insurance approval and construction approval are not identical

Eric's stated approach is that decking is a homeowner cost unless the insurer covers documented date-of-loss damage. Do not assume that finding damaged decking automatically makes it payable under a claim. Ask the insurer about coverage and ask the roofer about the proposed construction. Keep both conversations documented. A roofing change can require your authorization even while an insurance question is unresolved.

For a Bixby roof replacement estimate, bring the claim documents if there is an open claim, along with any competing scope you want explained. Use the Oklahoma roof cost guide for the broader budget discussion. The final check is straightforward: the signed roof scope, optional items, approved changes and final invoice should tell one understandable story. If a charge does not connect to approved work, ask for that connection before closing your records.

Frequently asked questions

Under the stated allowance, what does four decking sheets mean?

The first three sheets are included, so four total means one additional sheet at about $89 under Eric's stated terms. This is a counting example, not a diagnosis or a substitute for your written estimate.

Is extra-layer tear-off the same charge as replacing decking?

No. Eric says extra-layer tear-off is included. Hidden decking replacement follows the stated sheet allowance and approval process. Have both treatments reflected in the proposal.

Does damaged decking automatically become an insurance expense?

No. The insurer determines coverage. Eric describes decking as a homeowner cost unless the insurer covers documented date-of-loss damage; keep coverage questions separate from approval of construction changes.

Free inspection

Get Eric on your roof.

Call, text or send the form. You will hear back from Scott 1 Roofing, not a call center.

(539) 432-1383

Hours: 24 hours Monday–Saturday. Closed Sunday.

By submitting you agree to be contacted by Scott 1 Roofing about your request. No spam, no selling your info.