Roof Replacement Cost in Oklahoma (2026) | Scott 1 Roofing
OK Roofing Reg. #80007107·Malarkey Certified Pro Contractor

Guides ›

Homeowner guide · by Eric L. Scott, owner

What does a new roof cost in Oklahoma?

Straight answers from Eric Scott on what moves the price of a roof, how long it takes, and what should be in every quote.

Watch: Eric on what sets your roof price

Eric explains what sets your roof price (63 sec). Watch on YouTube

A useful roof-price starting point

A typical Oklahoma home roof replacement is about $15,000 to $18,000. This is a general starting range, not a fixed quote. Roof size, pitch, material choice and decking condition affect the written estimate. Small repairs start at about $150. Inspections and estimates are free.

This range is not tied to a published roof-square count, story count or one shingle line. Eric measures the property and specifies the roof system in the estimate. Steeper pitches, roof access, flashing and ventilation details can change the scope. Extra-layer tear-off is included in Eric's stated pricing; ask the written estimate to confirm the layers covered.

Eric's stated decking terms are the first three sheets included, then about $89 per sheet, up to ten sheets total. More than ten requires a signed decking agreement. Hidden decking damage cannot be fully assessed before tear-off. Ask how any additional work will be documented and approved before it begins.

Compare the same scope between estimates: tear-off, decking allowance, underlayment, flashing, ventilation, exact shingle product, cleanup and written warranty terms. A lower total with missing scope is not a like-for-like comparison.

Last updated:

Turn the starting range into a roof budget

The useful question is not whether someone can advertise a cheaper roof. It is whether that price buys the work your house needs. Start with the $15,000 to $18,000 typical-home range above, then ask Eric to explain where your measured roof falls. Do not use that range as a promise that every house fits inside it. A simple roof and a complicated roof are different jobs, even when the houses have similar living space.

Bring a short list to the inspection: any leaks you have noticed, the approximate age of the roof if known, and anything you want changed. Tell Eric about a room that gets hot, a stain that returns, or flashing that has been patched before. Those observations do not diagnose the roof. They help make sure the estimate addresses the problem you actually called about, rather than pricing shingles alone.

Living space is not a roof measurement

The square footage on a real estate listing describes the house, not the entire surface being reroofed. Roof slope, overhangs and the shape of the roof affect what must be measured. A garage or covered area can also belong in the roofing scope even though it is not finished living space. Ask which roof sections the proposal includes. That is more useful than comparing your indoor square footage with a neighbor's bill.

You do not need to climb a ladder or calculate the pitch yourself. Ask Eric to show you how the roof layout connects to the estimate. If a porch, addition or other roof section is excluded, have that written down. It is much easier to settle the boundaries before work begins than after you have assumed the entire property was included.

Read the proposal as a description of work

A good price discussion starts at the existing roof and ends at cleanup. What is coming off? What is going back on? Which details are being repaired, replaced or reused? Underlayment, flashing and ventilation should not disappear behind a single line that says new roof. Ask for an explanation you understand. You should be able to point to a line and say what it pays for.

Keep the exact manufacturer and shingle line visible when you compare bids. A brand offers different products, so a brand name by itself does not settle the comparison. If one estimate specifies rubberized asphalt with a Class 4 impact rating and another leaves the product blank, ask the second roofer to fill in the missing information. You cannot judge the price difference until you know whether you are comparing the same type of roof.

Separate a known allowance from an unknown condition

Decking is the part of this budget that deserves an early conversation. Eric's first three sheets are included. The stated additional-sheet price is about $89, up to ten sheets total, and work beyond that needs a signed decking agreement. Ask how the crew will show you what is damaged and how you will approve the added work if you are not home.

An allowance is not a diagnosis that three sheets will be needed. Nor does an apparently sound roof prove that the deck underneath is sound. The purpose of putting the terms in the estimate is to avoid deciding the price while the roof is open. Keep the extra-cost guide with your proposal so you can review that part separately from the shingle choice.

Do not make the discount your whole comparison

An insurance premium reduction is different from a lower construction bill. Eric supplies the Insurance Premium Reduction Request Form for a Malarkey Class 4 roof with the final invoice. Your insurer decides whether a reduction applies and how much it is. Do not subtract an assumed annual saving from the money needed to pay for installation. Ask the carrier about the exact product before you count that saving in your household budget.

Veterans and surviving spouses should have the separate roofing offer shown on the quote. The year-round $999.99 benefit and the additional 30% offer during Memorial Day and Veterans Day weeks need to be explained against the actual job. If insurance is involved, ask how everything will be documented before signing. A promotion should make the final amount clearer, not replace a written explanation.

Ask how a change gets approved

Before the old roof comes off, decide how Eric should contact you about anything outside the original scope. Give a number you can answer and ask what documentation you will receive. A photo and a plain explanation are easier to review than a vague message saying more work is needed. Ask to see both the proposed repair and its cost before authorizing a change.

Keep your signed estimate and any later agreement together. When the job is finished, compare the final invoice with that record. This is not about expecting a dispute. It is about having one clear account of the roof you bought, the changes you approved and the documents that belong with it. Those records also help when you later request an insurance premium review.

Price and schedule answer different questions

What should I keep after approving a roof estimate?

Keep the signed proposal, any approved change or decking agreement, and the final invoice together. They provide a record of the specified work and any additions you authorized.

Can I budget an insurance premium reduction as money toward installation?

Do not assume that saving will pay the installation bill. Your insurer decides whether a reduction applies; it is separate from the contractor’s written roof price.

The installation examples below describe roofs of different sizes and slopes. They are not a reservation for your address. Ask Eric to distinguish the time spent working on the house from the larger window between deposit and completion. Have him confirm the expected schedule for your job and explain what you need to do before the crew arrives.

Use that conversation to discuss access, vehicles and anything around the house that needs attention during the work. Do not choose a roof only because an estimate sounds faster. First make sure the scope, materials and approval process are right. Then compare schedules for the same work. A clear sequence is more useful than a rushed promise that leaves you guessing about when each step occurs.

Leave the inspection with answers, not just a total

Before you put two estimates side by side, write down what you still cannot explain about either one. Missing product names, unclear decking terms and an unspecified warranty are questions to resolve, not details to guess. If an answer changes the price, ask for the revised proposal in writing. Keep the older version so you can see what changed.

You can use the free inspection to decide whether replacement is even the right expense. A repair starts at about $150, but whether a repair solves your problem depends on the condition Eric finds. Read repair or replace before committing your budget. The goal is a roof decision you can understand and afford, not a bigger project by default.

Frequently asked questions: roof budgeting

Should I compare roof quotes using my indoor square footage?

No. Ask for estimates based on the roof itself and confirm which roof sections are included. Indoor living space does not describe every surface being reroofed.

The two things that set the price

Roof size and roof pitch. Pitch is how steep the roof is, from a low 3/12 up to a steep 12/12. Steeper roofs take more time, more safety setup and more labor.

Material choice

Rubberized asphalt (Malarkey), standard asphalt, metal, tile, composite or flat systems. As a Malarkey Certified Pro, Scott 1 Roofing can price a Class 4 rubberized asphalt shingle about where most companies price a Class 3, whether that is GAF, Owens Corning, CertainTeed or Tamko.

The cost you cannot see until tear-off

Rotten decking only shows up once the old roof is off. If it is there, it is replaced at about $89 per sheet and you are told before it happens.

How long does it take?

About half a day for a 17-square roof, about two days for a 70-square roof, and 2.5 to 3 days for a steep 12/12. From deposit to finished roof is typically 7 to 10 business days. You do not need to be home.

What belongs in every quote

Tear-off, decking inspection, underlayment, the shingle or metal system, flashing, ventilation, cleanup and warranty, each line explained so you can compare it against any other bid.

Savings after the roof is on

On a Malarkey Class 4 roof, Eric gives you an Insurance Premium Reduction Request Form with your final invoice. Veterans and surviving spouses get $999.99 back, plus 30% off during Memorial Day and Veterans Day weeks.

Book a free roof inspection

More guides: Hail damage insurance claim guideFirst 24 hours after hailMalarkey vs. GAF shinglesHow long a roof lasts in Oklahoma · Malarkey Class 4 & your insurance premium · Oklahoma roofing questions, answered · Rubberized asphalt vs. standard asphalt shingles · Repair or replace your roof? · What costs extra on a new roof · Veterans roofing discount in Oklahoma

Free inspection

Need help nearby? Scott 1 Roofing also handles roof replacement in Owasso, with the same owner on every job.

Get Eric on your roof.

Call, text or send the form. You will hear back from Scott 1 Roofing, not a call center.

(539) 432-1383

Hours: 24 hours Monday–Saturday. Closed Sunday.

By submitting you agree to be contacted by Scott 1 Roofing about your request. No spam, no selling your info.